OPAC Home  

Your search returned 71 results.

Sort
Results
Adaptability of OHSAS 18001 as a regulation in the Sri Lankan construction industry: consultant's perspective by Language: English
Publication details: Moratuwa Dept.of Building Economics, University of Moratuwa 2018
Dissertation note: University of Moratuwa 2018 Department of Building Economics Faculty of Architecture
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Adopting to online dispute resolution to resolve disputes in Sri Lankan construction industry by Language: English
Publication details: [2024]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2024
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Analysing the contractors all risk insurance (CAR) policy claims in Sri Lankan construction projects by Language: English
Publication details: [2024]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2024
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Analysis of the perception of legal and institutional framework relating to public private partnerships by Language: English
Publication details: [2024]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2024
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043) .

Analysis on contract documentation errors and issues to minimize disputes in MEP sub-contracting work by Language: English
Publication details: [2024]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2024
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Analyze whether the challenges made against arbitrators in arbitrations conducted in Sri Lanka are used to delay or disrupt the arbitrations by Language: English
Publication details: [2024]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2024
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Applicability of the dab method for settlement of construction disputes in high - rise building projects in Sri Lanka by Language: English
Publication details: [2023]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2023
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043) .

Application of early negotiation as a dispute avoidance mechanism in Sri Lankan road construction projects by Language: English
Publication details: Moratuwa Dept. of Building Economics, University of Moratuwa 2018
Dissertation note: University of Moratuwa 2018 Department of Building Economics Faculty of Architecture
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Challenges faced by contractors on construction arbitration practice in Sri Lanka by Language: English
Publication details: [2023]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2023
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Claims Avoidance in road projects : Corollary contributions of lessons from the past by Language: English
Publication details: [2023]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2023
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Competency requirements of procurement team in pre-contract stage to minimise disputes of public construction projects in Sri Lanka by Language: English
Publication details: [2024]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2024
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Conflict handling styles used in re-measurement construction contracts in Sri Lanka by Language: English
Publication details: [2021]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2021
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Constraints implementation of PPP urban development infrastructure projects by Language: English
Publication details: [2024]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2024
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043) .

Cost impact of " security of payment act" to the Sri Lankan construction supply chain by Language: English
Publication details: Moratuwa Dept. of Building Economics, University of Moratuwa 2018
Dissertation note: University of Moratuwa 2018 Department of Building Economics Faculty of Architecture
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Critical factors affecting the practice of alternative dispute resolution methods in building projects in Sri Lanka by Language: English
Publication details: [2022]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2022
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Developments to be brought into condition precedent notice provision in contractor's claim clause for betterment of the contractor: contractor's perspective by Language: English
Publication details: Moratuwa Dept. of Building Economics, University of Moratuwa 2018
Dissertation note: University of Moratuwa 2018 Department of Building Economics Faculty of Architecture
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Disputes and resolution mechanism of public-private partnership projects in Sri Lankan construction industry by Language: English
Publication details: [2018]
Dissertation note: University of Moratuwa 2018 Department of Building Economics Faculty of Architecture
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Disputes arising from variations in road construction projects in Sri Lanka by Language: English
Publication details: [2018]
Dissertation note: University of Moratuwa 2018 Department of Building Economics Faculty of Architecture
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Disputes in construction projects : a perspective of small and medium level (SMC) contractors in Sri Lanka by Language: English
Publication details: [2024]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2024
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).

Disputes in contract management in international engineering, procurement and construction (EPC) projects : the case of Chinese contractors by Language: English
Publication details: [2022]
Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2022
Online resources:
Availability: Items available for reference: Library, University of Moratuwa: Not For Loan (1)Location, call number: Thesis Collection 69:34(043).


Copyright @ 2015-2025 Library, University of Moratuwa, Katubedda, Moratuwa (10400), Sri Lanka