OPAC Home  

Your search returned 4 results.

Cost-benefit analysis : for engineers and planners

by Snell, Michael.

Language: EN Publisher: London Thomas Telford 1997Availability: Items available for loan: Library, University of Moratuwa (2). Location(s): Lending Collection Call number: 65.03 S6.

Lean construction

by Alarcon, Luis [ed.].

Language: English Publisher: Rotterdam A.A. Balkema 1997Availability: Items available for loan: Library, University of Moratuwa (1). Location(s): Lending Collection Call number: 69:658 L4.

Pre - construction delays in civil engineering projects in Sri Lanka.

by Fernando, W.M.C | Dr. A.A.D.A.J. Perera [supervisor].

Language: English Publisher: [1994]Dissertation note: Department of Civil Engineering MEng./1994. Faculty of Engineering University of Moratuwa 1994 Online access: Click here to access online Availability: Items available for reference: Library, University of Moratuwa Not For LoanCall number: 69.008 (1). : Location(s): Thesis Collection Call number: 69.008 .

Quality management system in manufacturing organization vs project organization: a comparative case study

by Marikkar, M.J.M.N | N.D. Gunewardena [supervisor].

Language: English Dissertation note: Department of Civil Engineering Faculty of Engineering University of Moratuwa 2001 Online access: Click here to access online Availability: Items available for reference: Library, University of Moratuwa Not For LoanCall number: 658.56 (1). : Location(s): Thesis Collection Call number: 658.56 .


Copyright @ 2015-2021 Library, University of Moratuwa, Katubedda, Moratuwa (10400), Sri Lanka