OPAC Home  

An evaluation on causes of delays related to pre- construction period approval process of hotel construction projects

By: Ranaweera, Anupa Chandra Nayanajith SabaragamuwaContributor(s): Dr.(Mrs.) Chadanie Hadiwatege [supervisor]Language: English Publisher: [2020]Description: CD-ROM included xii, 78p. : ill.(col.), 01 folded leave, tablesSubject(s): PROJECT MANAGEMENT- Dissertations | BUILDING ECONOMICS- Dissertations | PRE- CONSTRUCTION APPROVAL PROCESS - Delays | HOTEL CONSTRUCTION PROJECTS | TOURISM – Sri Lanka | MSc in Project ManagementOnline resources: Click here to access online Dissertation note: Department of Building Economics Faculty of Architecture University of Moratuwa 2020
    Average rating: 0.0 (0 votes)
Item type Current location Call number Shelving info Copy number Status Date due Barcode Item holds Course reserves
Thesis Thesis Library, University of Moratuwa
The University of Moratuwa Library (UML) is one of the most prominent technology libraries in the country. Its main subject specializations are Engineering, Architecture and Information Technology. However, the library caters to the requirements of the membership by housing books and other materials of general interest as well.
Thesis Collection
69.003(043) (Browse shelf) DBE 04/129 LB/TH/04/2021 Not For Loan TH4435

M.Sc. in Project Management

Total holds: 0

Department of Building Economics Faculty of Architecture University of Moratuwa 2020

There are no comments on this title.

to post a comment.

Copyright @ 2015-2021 Library, University of Moratuwa, Katubedda, Moratuwa (10400), Sri Lanka